Final installer checklist

The handover check before tiling, rendering or applying the final finish.

Download PDF
Handover All applications

Overview

Use this page as the installer handover check before tiling, rendering or applying the final finish. Print it or open it on your phone on site.

Final check

Check Requirement
Substrate Sound, dry, clean, stable and correctly framed/supported
Set-out Joints planned; edges supported; penetrations located before fixing
Cutting Clean cuts, dry fit completed, exposed edges treated where required
Fixing Corrosion-resistant screws/washers; approx. 200 mm edge / 300 mm field unless the project detail requires otherwise
Sealant Thermasheet MSP Sealant used at nominated joints, corners, penetrations and interfaces
Joint reinforcement Fibreglass mesh/tape and compatible cementitious or waterproofing treatment completed
Wet areas Waterproofing completed to the applicable wet-area design and AS 3740
Curves Correct Flex/UltraFlex product selected; radius within product limits; support frame follows the curve
External Project-specific support, fixing, edge sealing, reinforced finish, flashings and movement joints confirmed
Finish Tile/render/microcement/coating system approved for the substrate and service conditions